This 4-day class examines the installation and preparation of propane storage tanks and cylinders, vapor regulation, distribution and metering systems, liquid distribution and vaporizer systems. It also covers pressure testing, leak checking procedures, installing and testing cathodic protection systems. Upon completion of this class, the student should be able to identify polyelthelyn (PE) tubing, copper tubing and black pipe fittings. The student also should be able to establish appropriate line size and manifold systems when placing regulators and appliances into operation. First day of class begins at 10:00, then at 8:00 am each remining day. |